We prepare the work area and Restrict access –we minimise the number of people present. Close all doors. we use tape and notices to warn others of the project works, we ensure adequate lighting, throughout the location.
We use Equipment Warning tape and notices Class H vacuum cleaner (BS 8520 following regulations for em4) for large areas Sharp knife Hammer Scraper Shovel Garden-type sprayer containing wetting agent Bucket of water and rags Asbestos waste bag Clear polythene bags.
Place the scraper in the joint between the tiles. Lift the tile gently – try to avoid breakage. For firmly-fixed tiles, tap the scraper with the hammer. For a large tiled area, lift tiles using a shovel. This speeds up the job and avoids kneeling close to the tiles. Spray water under the tiles as they are lifted, to suppress dust and wet any asbestos paper that may be present. See also sheet a17. Wet any asbestos paper tile backing as the tiles are lifted. Gently scrape up adherin
When we have removed only a few tiles, use damp rags to clean the floor. we clean larger areas with the Class H vacuum cleaner and/or damp rags. We then Clean the equipment with damp rags. Put debris, used rags and other waste in the asbestos waste bag and tape it closed. Put the asbestos waste bag in a clear polythene bag and tape it close in accordance to em9 regulations.
We visually inspect the area to make sure that it has been cleaned properly. Clearance air sampling is not normally required. We liaise with the duty holder or client to check off the job.
Add a footnote if this applies to your business
Copyright © 2024 Card Flooring - All Rights Reserved.
Powered by GoDaddy